120 Minute Durasteel Fire Rated Ductwork
The SMT system is formed by fixing 9.5mm, DURASTEEL® sheets on to a welded or cleated, prefabricated steel skeletal framework, minimum 3mm thick. The sheets are fixed using self-drilling self-tapping screws, with PROMASEAL® mastic applied before fixing to the frame. Flanged lengths of ductwork are bolted together trapping the PROMASEAL® mastic between the mating flanges. The SMT system can be constructed in 1, 2, 3 or 4 sided configurations.
Ductwork Insulation Matrix
Natural Ventilation / Powered Ventilation / Smoke extract | |||||
Minutes | Stability | Integrity | Rock Wool Insulation | ||
Type A or B duct – 300°C smoke temperature | Type A duct – 1000°C+ | Type B duct -1000°C | |||
30 | Yes | Yes | SMT | SMT | SMT |
60 | Yes | Yes | SMT | SMT + 30mm of 60 kg/m³ | SMT + 50mm of 60 kg/m³ |
120 | Yes | Yes | SMT | SMT + 50mm of 60 kg/m³ | SMT + 80mm of 140 kg/m³ |