For your information

You are being redirected to one of our divisional subsites which contains more detailed information on the required division. To navigate back to the main Invicta Group site, please click the link found in the footer at the bottom of the page.

Valve Enclosures Provide Safe Operational Access At Chemical Storage Facility

Dubai, UAE

Quick Quote

Contact Fraser Shearer Sarun Vysakham Ben Tan Azim Rizvi Anand Raghavan Our USA Office

Home Case Studies Valve Enclosures Provide Safe Operational Access At Chemical Storage Facility

Application

Valve Enclosure

DOW Chemical Company’s chemical storage facility in Dubai recently identified a safety requirement to protect the main deluge valves within a chemical storage area from potential fire and explosions. The valves were located in an open and exposed area adjacent to the main chemical storage facility.

Invicta’s Durasteel division in the Middle East were tasked with designing 3-sided Durasteel barriers which had to be completely free-standing, wind resistant and weather-proof, and maintain their integrity within potentially harsh chemical atmospheric conditions.

Our solution was to build free-standing Durasteel valve protection enclosures constructed from 80mm x 60mm x 3mm steel channels with a single sheet of Durasteel bolted to the exterior surface.

Each enclosure was completely installed within 1.5 days from start to finish and now provides the valves with the blast and fire protection required to ensure continued and safe operational access in the event of a fire or explosion.

Site supervisor, Louie Aguilar, commented “it was a very fast installation, completed incredibly quickly by a very professional team and we are extremely pleased with the outcome.”

 

Share/Like this page

Accreditations & Affiliations

SpecUp - System Specification Wizard

Answer the 5 short questions below to receive your recommended Durasteel system specifications. Hover over the ? icons for a brief explanation.

Question 1/5

Type of system required?

Question 2/5

Fire rating required?

Question 3/5

Fire integrity-only or integrity and insulation?

Question 4/5

Fire attack risk from one side or both sides of the system?

Question 5/5

Blast rating required in addition to fire rating?

Creating your results page

Thanks for completing the SpecUp, you’ll be redirected to your results shortly.

Click here if you aren't redirected after a few seconds

Start your project

Tell us about your project. Please complete this form. One of our sales team will come back to you with more details. If you prefer, you can drop us an email.





    Project details




    Attach any files that may assist us with your enquiry (specs, drawings, bill of quantities, etc.)

    Acceptable file types are .pdf, .jpg, .dwg, .xls, .xlsx, .doc, .docx, .zip and .rar up to a maximum of 15mb. For files larger than this, please use the external file upload link below.